Skip to content

Conversation

purelind
Copy link
Collaborator

No description provided.

@ti-chi-bot ti-chi-bot bot requested a review from wuhuizuo October 10, 2024 10:38
Copy link

ti-chi-bot bot commented Oct 10, 2024

I have already done a preliminary review for you, and I hope to help you do a better job.

Key Changes:

  • The file pipelines/pingcap/tiflash/release-6.5/pull_integration_test.groovy was modified.
  • The variable POD_INTEGRATIONTEST_TEMPLATE_FILE was changed from pipelines/pingcap/release-6.5/pod-pull_integration_test.yaml to pipelines/pingcap/tiflash/release-6.5/pod-pull_integration_test.yaml.

Potential Problems:

  • There are no major potential problems with this pull request, as it is a simple fix for a file path.

Fixing Suggestions:

  • The change seems to be correct as it is, and there are no apparent issues with the code. Therefore, the pull request can be merged as is, assuming it has passed all relevant tests and reviews.

Copy link

ti-chi-bot bot commented Oct 10, 2024

[APPROVALNOTIFIER] This PR is APPROVED

Approval requirements bypassed by manually added approval.

This pull-request has been approved by:

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@wuhuizuo
Copy link
Collaborator

/retest

@ti-chi-bot ti-chi-bot bot merged commit aeaa255 into PingCAP-QE:main Oct 10, 2024
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Projects
Status: Done
Development

Successfully merging this pull request may close these issues.

2 participants